Filmore North Group Project

RR3- FILMORE NORTH GROUP A, PROJECT ID: RR037, PROJECT NO: 2012-FEMA-2B-1

Client: City of New Orleans DPW
General Contractor: Command Construction Industries
Project Engineers: Professional Engineering Consultants Corp, Infinity Engineering Consultants LLC
Project Length: 05/2019- 03/2020
Project Funding: FEMA Recovery Roads Program
Scope of Work:

  • Removal and grade of concrete and asphalt roadway, curbs, curb and gutter.
  • Concrete pouring and finishing of roadway, curbs, curb and gutter
  • Cold planning of asphalt roadway
  • Paving of asphalt binder and wearing
  • Adjustments of catch basins, manholes, and water valves

The Description

We worked side by side with CNO, PEC, Infinity, and Command Construction to drastically improve the roadways, drainage, and waterline systems in this area. The area included but was not limited to Pratt, Charlotte, Chatham, Paris, Perlita, Cartier, and Bancroft from Filmore to Robert E Lee. This also includes all of the cross streets in between and the area around Holy Cross High School. We were able to create smooth driving surfaces while eliminating areas that were holding water and not draining. Also created a safer driving surface for the students of Holy Cross.